BATOR GROUP - Design, Engineering, Production and Maintenance
Glas Trösch (Switzerland)
Fire Station #341 in Tucson (AZ) was completed in October 2019. The doors fulfil all customer requirements, can be easily unlocked for manual operation if necessary and function with the utmost reliability and minimal maintenance requirements. The control system includes over 100 different functions that can be conveniently monitored via the display.
Return to overview